Anyone who has ever muddled through a group project knows that the situation is terribly ripe for people acting a fool. The reality is that there are plenty of folks that simply can't be bothered to pull their weight and do their jobs correctly. By their very design it almost seems like group projects invite that unwanted stress. Well, good for this student for taking things into their own hands and enacting the pro revenge that they did. For another similar story check out the time that a group attempted to cut a student out after they did 60% of the work, and then the righteous fail that ensued.
No comments:
Post a Comment